All day GO trains and electrification a pipe dream – Sullivan

Diesel powered for how long?

MP Mike Sullivan has called a ‘Community Town Hall’ meeting for Thursday 8th March at the York West Active Living Centre. Apparently Metrolinx has backed away from the number of GO trains promised because the Airport Link (using the same tracks but different platforms) will have priority. In addition, he would like community reaction  to the 27-year timeframe for electrifying the line as proposed in a recent provincial study. Davenport MPP Jonah Schein, will be on hand as NDP Transport Critic. Should be a lively meeting.

Date: Thursday March 8.

Time: 6:30

Place: York West Active Living Centre,1901 Weston Road.

2 thoughts on “All day GO trains and electrification a pipe dream – Sullivan”

  1. Note the meeting is Thursday March 8th. It is correct in the body of the post, but says March 6 at the bottom.

Comments are closed.