High Speed Rail – bring it on!

I am going to take the opposite viewpoint to my esteemed colleague Adam on this topic. Here’s the ‘good cop’ version.

David Collenette was the man behind the UP Express, having first proposed it 20 years ago. His original vision was for a direct train that would offer a 22-minute ride from Pearson to Union that would cost $20. Without going into the details of what happened between concept and reality (read our back issues), the end result was that Weston in effect ended up with an all-day commuter rail service into Toronto for about the same price as a GO Train ticket.

Collenette has re-emerged as a ‘Special Advisor’ in a report outlining a vision of a high speed rail line joining Toronto and Windsor.

Lord knows how hard it is to get anything built in this neck of the woods. Collenette’s vision of the Air Rail Link (as it was then known), ended up as a huge gift for Weston’s commuters. Now on the wildly popular UP Express (since lowing prices), in rush hours, it’s standing room only.

What about the Toronto to Windsor HSR Line? It’s certainly needed. In fact, decent rail links all over Canada are needed. Part-way to Windsor lies Canada’s Silicon Valley in the Kitchener / Waterloo area. It’s too close to fly there (only 100 km) yet GO Trains take at best 2 hours. An HSR train would use much of the same corridor and cut travel time between the two city centres dramatically. Stops at Malton (Pearson), Guelph, Kitchener and London are proposed for the first phase.

The HSR route will use the UP Express corridor. Click for larger view.

What’s in it for Weston?

In 2021, the UP Express will add one more station at Mount Dennis and connect to the new Crosstown Line. Will this new station make the UP Express unacceptably slow? There is a rumoured possibility that Weston’s station will be too close to Mount Dennis and may be closed as a result.

The report itself recommends that existing services be ‘optimized’:

The Province should align provincial mandates to optimize rail services by directing Metrolinx and MTO to collaborate on the development of an Integrated Rail Strategy for the Toronto-Kitchener corridor, which would

•Clarify the mandates of GO RER, UP Express and HSR on the corridor.

•Assess ridership and service frequencies.

•Recommend how the Province might optimize GO RER, UP Express and HSR ridership to maximize the benefit to Ontarians.

One way around the two station dilemma might be to convert the existing UP Express into a commuter line and open new stations along the way. This could be a way of easing the burden on the subway system while preserving Weston’s regular and rapid link to downtown.

What will the cost be? Anyone who has done home renovations will know that estimated costs before a project begins are likely to end up higher in reality. What studies do show is that public transit adds value to a community if done well. No doubt changes and variations are up for grabs as they were with the original idea for the Airport Rail Link.

What about a high speed train running through our community? The train won’t likely be that fast in the city. Currently the UP Express hits speeds of up to 130 km/h between Bloor and Weston for an average of around 77 km/h. The report projects a somewhat faster average speed (just under 100 km/h from Union to Malton).

Travel times for the faster of the two HSR scenarios. Click for larger view.

The next steps will be more studies and consultations. This is just the beginning of what will be a long and ambitious project. While there may be pitfalls along the way, there will be opportunities and this proposed infrastructure holds huge promise and potential for Weston.

We do however need to be on top of this as a community and make sure that the people of Weston / Mount Dennis are heard loud and clear.

1 thought on “High Speed Rail – bring it on!”

  1. David Collennette promised that the airport link would be private sector and would not cost taxpayers one Nickle. $1.4 Billion later all taxpayer dollars, it does not run full as an airport link. Only because the fares were lowered do we have some trains near capacity, with most using it as a commuter line.
    I fear the same kind of fate for the HSR. $21 Billion is the estimate. If up express is the example multiply by 7. $140 billion is a lot of Nickles.
    A lot of hard work and persistence by a lot of people got us a Station, lower fares, a tunnel through Weston, two pedestrian bridges and promises of electrification. Roy is right that if this gets serious we will have to show the same kind of vigilance.

Comments are closed.